What is your standard lead time?
For commodity valves in stock, such as GGC (Gate, Globe, Check) low-pressure carbon steel valves (WCB valves below Class 300 up to 24”), we maintain a large inventory and can deliver them promptly upon request.
For newly manufactured valves, the standard lead time is typically 8 to 12 weeks. For expedited orders, special designs, or large quantities, please contact us directly to confirm the lead time.
About Us
Categories
Useful Links
Our Contacts
Building 2, NO.59, Songshan Road, SND, Suzhou, China